Workplace exposure limits
Some workplace processes involve the use of substances that could cause harm. The Control of Substances Hazardous to Health Regulations 2002 (COSHH) require that employers prevent or reduce workers' exposure to such substances.
- Inhalation.
- Ingestion.
- Contact with the skin.
- Contact with the eyes.
- Skin puncture.
COSHH stipulates that the control of hazardous substance exposure will only be regarded as being adequate if it falls below the necessary workplace exposure limit (WEL). The regulations place a duty on employers to prevent or control exposure to within the particular WEL.
WEL values are approved by the Health and Safety Commission (HSC), which acts on the advice of the Advisory Committee on Toxic Substances (ACTS). They are expressed as a time weighted average (TWA). There are two variations of WEL:
- Long-term exposure limit (LTEL): The maximum exposure over an 8-hour period. This is intended to protect the workforce from contaminants which, over a long period of time, may cause ill health.
- Short-term exposure limit (STEL): The maximum exposure over a 15-minute reference period. This is intended to protect the workforce from peak exposure incidents which might result in immediate and acute ill health.
A document published by the Health and Safety Executive (HSE) contains the list of WELs for use with COSHH – EH40/2005 Workplace exposure limits.
Since there are a large number of chemical compounds used in construction, there will be some that are not included on this list of WELs, perhaps due to a lack of information about them. However, this does not mean that they are therefore safe. They should be controlled to a level at which the workforce could be exposed for a long period of time without experiencing any adverse health effects.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
























